India’s heat-pump specialist · 30 years of engineering
Our work

10,000+ systems. 20+ states. Names you know.

From Radisson, Marriott, Fairmont and Hilton to NIMS, Bosch, Bajaj and ACC, organisations that can’t afford hot-water failures rely on Tempratech.

10,000+systems installed
20+states across India
30 yrsof engineering
5 sectorshospitality to industry
Installations

Where Tempratech systems are running.

Client organisations that have specified Tempratech heat pumps. Model schedules and measured savings are shared per project on request.

16 results

project photo
Hotels & Resorts

Radisson

Centralized hot water · details on request

project photo
Hotels & Resorts

Marriott

Centralized hot water · details on request

project photo
Hotels & Resorts

Fairmont

Centralized hot water · details on request

project photo
Hotels & Resorts

Hilton

Centralized hot water · details on request

project photo
Hotels & Resorts

Lemon Tree

Centralized hot water · details on request

project photo
Hotels & Resorts

Ramada

Centralized hot water · details on request

project photo
Healthcare

NIMS

24/7 hot water · details on request

project photo
Healthcare

Mahatma Gandhi Hospital

24/7 hot water · details on request

project photo
Healthcare

Balaji Soni Hospital

24/7 hot water · details on request

project photo
Residential

Royal Ensign Apartment

Group housing · details on request

project photo
Residential

Mahima Group

Developer projects · details on request

project photo
Residential

Eisha Zenith

Group housing · details on request

project photo
Industry

Bosch

Process hot water · details on request

project photo
Industry

Bajaj

Process hot water · details on request

project photo
Industry

ACC

Process hot water · details on request

project photo
Industry

Mahindra

Process hot water · details on request

Client list per Tempratech’s approved proof bank. Photographs, model schedules and measured savings are added per project as the client releases them.

Case studies

Three projects, told properly.

plant room photo
Awaiting client content

Flagship hospitality case study

The lead story on this page: property type and size, the model schedule installed, what it replaced, and the measured before/after energy or cost figure. Ready to fill as soon as Tempratech confirms the numbers.

  • Property, location and room count (or anonymised description)
  • Model schedule and storage volume
  • Verified saving, and the basis it’s calculated on
  • One quote from the client’s engineering team
How we present numbers

Every savings figure on this site is shown with the basis it was calculated on. Published comparison: about ₹10 of hot water per 100 L against ₹44 on electric, ₹32 on LPG and ₹23 on PNG — varying with utility rates. Project figures are only published once the client has confirmed them.

Awaiting client content

Healthcare case study

A hospital installation — bed count, redundancy arrangement, and how continuity of supply was maintained during changeover.

Awaiting client content

Industrial process-heat case study

A high-temperature installation — process temperature required, what it replaced, and the energy comparison.

For consultants and owners

What we can share on request.

Evaluating a system is easier with real references. Ask and we'll arrange these.

Reference project list

Installations in your sector and region, with model schedules where the client permits.

A site visit

See a running plant room of comparable size, and speak to the engineering team looking after it.

Sizing & savings estimate

A model selection and running-cost comparison worked on your own tariff and demand.

Certified toAHRI 210/240ISO 9001CEIntertekKeymarkRoHSWaterMark

Let's find the right system for you.

Tell us your hot-water need and we'll recommend the right Tempratech model — free.